Concrete Calculator

Add slabs and post holes for the cubic yards, bag count, and full materials list — plus an honest note when ready-mix beats bagged concrete.

Bag size

Slabs / pads

Slab 1

Post holes(optional)

Waste allowance5%

Adjust to your site — we never pad quantities.

You'll need
59 bags
  • of 80 lb concrete mix

Materials list

Wire mesh reinforcement1 roll
~150 sq ft per roll · overlap seams by 6 in · lift off ground before pour
Heavy gloves + rubber bootsoptional
Wet concrete is highly alkaline — protect skin and feet.

Tools you'll want

Buy-once items — skip any you already own.

Ready-mix delivery (see note)
Job is ≈ 1.3 cu yd — ready-mix delivery is typically faster and cheaper than 59 bags above 1 cu yd.
Rebaroptional
For structural slabs and footings — size to local building code.
Mixing hoe or paddle mixer
Drill paddle mixer is faster for 5+ bags.
Form boards + stakes (2×4)optional
Frame the slab perimeter; oil boards before pouring.
Bull float or mag trowel
For finishing a flat surface.

Where to buy (optional)

Happy with your list? Tap any item below to open it at a retailer. These are affiliate links that support the site at no extra cost.

Estimates only — verify quantities before buying.

What actually affects how much concrete you need

Concrete volume math is exact, but real-world pours rarely match the math exactly. Sub-grade that isn't perfectly level eats extra concrete in the low spots, which is why most contractors budget 5–10% over the calculated volume rather than ordering to the cubic inch. Post holes waste even more predictably: hand-digging rarely produces a perfectly round, straight-sided hole, so the actual volume tends to run higher than the cylinder formula suggests — 10% is a safer minimum there. Weather affects more than pour timing: concrete cures slower in cold temperatures and can be damaged by frost within the first 24–48 hours, while hot, dry weather causes surface water to evaporate too fast, weakening the top layer if it isn't kept damp. Bagged mix works fine for small pours, but once you're past roughly a cubic yard, ready-mix delivery is usually cheaper and far less physically demanding.

How to calculate how much concrete you need

Concrete is a volume calculation. Slabs use L × W × thickness; post holes use the cylinder formula:

slab: cu ft = length × width × (thickness_in ÷ 12)
post hole: cu ft = π × (diameter_in ÷ 24)² × depth
cu yd = total cu ft × (1 + waste%) ÷ 27
bags = cu ft with waste ÷ yield per bag

An 80 lb bag yields 0.6 cu ft; a 60 lb bag yields 0.45 cu ft. Once the job exceeds about 1 cubic yard, ordering ready-mix is almost always faster and cheaper — the calculator flags that automatically.

Common mistakes

  • Mixing dozens of bags when ready-mix is cheaper — flag appears above 1 cu yd.
  • Under-estimating thickness — a 6 in slab uses 50% more concrete than a 4 in slab.
  • Not allowing enough cure time — driving on concrete too soon cracks the surface.
  • Skipping reinforcement required by local building code for structural work.

Frequently asked questions

How much concrete do I need for a 10×10 slab?+

A 10 × 10 ft slab at 4 inches thick is about 33 cubic feet, or 1.2 cubic yards with a 5% waste allowance. That works out to approximately 56 × 80 lb bags — which is why most slabs this size are poured more easily (and cheaply) as ready-mix.

How many 80 lb bags of concrete make a cubic yard?+

One 80 lb bag yields about 0.6 cubic feet. A cubic yard is 27 cubic feet, so you need about 45 bags to fill one cubic yard. A 60 lb bag yields 0.45 cu ft, so it takes about 60 bags per cubic yard.

When should I order ready-mix instead of bags?+

Once your job exceeds about 1 cubic yard (roughly 45 × 80 lb bags), ordering ready-mix from a batch plant is almost always faster, less labour-intensive, and often cheaper. The calculator flags this automatically.

How thick should a concrete slab be?+

Four inches is standard for patios, walkways and shed floors. Driveways need at least 5–6 inches; areas under heavy equipment require 6 inches or more. Always check your local building code and add the reinforcement it specifies.

How much concrete do I need for a post hole?+

For a 10 in diameter, 3 ft deep hole: volume = π × (5/12)² × 3 ≈ 1.6 cubic feet, or about 3 × 80 lb bags. Enter the diameter and depth in the post holes section and the calculator totals all holes at once.

Do I need wire mesh in a concrete slab?+

Wire mesh is recommended for slabs that carry vehicles or heavy loads, or where cracking must be minimized. For light-duty patios and walkways it is optional but inexpensive insurance. Rebar is required by code in many structural applications.

How long does concrete take to cure?+

Concrete reaches walking strength in about 24 hours and driving strength in 7 days. Full structural strength develops over 28 days. Keep the slab moist (cover with burlap or plastic) for the first 7 days — it cures stronger when it dries slowly.

Related calculators